Mianyang Fubang Electronic Control Equipment Co., Ltd.Mianyang · China

Hydropower & Power Generation

Consider station auxiliaries, operating DC and generation-related control equipment as distinct parts of a power-station procurement package.

System Requirements

  • Protection, control and switchgear operation establish the DC supply requirement.
  • UPS selection starts with the actual AC load and its battery/backup arrangement.
  • Excitation and turbine-governor equipment must be matched to the generator or turbine and its control requirements.

Relevant Equipment

Confirm the equipment, supply scope and interfaces required for your project before ordering.

Start the Selection Discussion

  • Which auxiliary and control loads are included in the supply scope?
  • What generator or turbine information is available for the control equipment?
  • Which system interfaces, battery duration and installation conditions need coordination?

Share what you know now. Detailed specifications can follow after the first conversation.