Hydropower & Power Generation
Consider station auxiliaries, operating DC and generation-related control equipment as distinct parts of a power-station procurement package.
System Requirements
- Protection, control and switchgear operation establish the DC supply requirement.
- UPS selection starts with the actual AC load and its battery/backup arrangement.
- Excitation and turbine-governor equipment must be matched to the generator or turbine and its control requirements.
Relevant Equipment
- GZG10 DC Operating Power
- Integrated AC/DC Station Power
- UPS Systems
- Excitation & Turbine-governor Equipment
Confirm the equipment, supply scope and interfaces required for your project before ordering.
Start the Selection Discussion
- Which auxiliary and control loads are included in the supply scope?
- What generator or turbine information is available for the control equipment?
- Which system interfaces, battery duration and installation conditions need coordination?
Share what you know now. Detailed specifications can follow after the first conversation.